Thermo-pride OH5-85DE User Manual

Browse online or download User Manual for Other Thermo-pride OH5-85DE. Thermo Pride OH5-85DE User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
ECM OPERATION MANUAL
FOR USE WITH MODELS:
OH5-85DE OL5-85FDE OL5-85RDE
OH11-105DE OL11-105FDE OL11-105RDE
OH2-56DE OL2-56FDE OL2-56RDE
OC5-85DE OC2-56DE OH5-85DXE
: IF YOU DO NOT FOLLOW THE SAFETY PRECAUTIONS BELOW AND IN THIS MANUAL, A
FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY, OR LOSS OF
LIFE.
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF
THIS OR ANY OTHER APPLIANCE.
INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER, SERVICE AGENCY
OR THE GAS SUPPLIER. (REFERRED TO IN THESE INSTRUCTIONS AS A QUALIFIED HEATING
CONTRACTOR).
PLEASE READ THESE INSTRUCTIONS PRIOR TO INSTALLATION, INITIAL FIRING, AND BEFORE
PERFORMING ANY SERVICE OR MAINTENANCE. THESE INSTRUCTIONS MUST BE LEFT WITH THE
HOMEOWNER AND SHOULD BE RETAINED FOR FUTURE REFERENCE BY QUALIFIED SERVICE
PERSONNEL.
THERMO PRODUCTS, LLC.
BOX 217
NORTH JUDSON, IN 46366
PHONE: (574) 896-2133
MADE IN USA
MO-434
ECN 4853-MA 082506
Page view 0
1 2 3 4 5 6 ... 20 21

Summary of Contents

Page 1 - ECM OPERATION MANUAL

ECM OPERATION MANUAL FOR USE WITH MODELS: OH5-85DE OL5-85FDE OL5-85RDE OH11-105DE OL11-105FDE OL11-105RDE OH2-56DE OL2-56FDE OL2-56RDE

Page 2

All installations and services must be performed by qualified service personnel. BLOWER CFM Figure 2: BOARD LAYOUT WITH SWITCHES 8

Page 3

All installations and services must be performed by qualified service personnel. C. Inputs Power supplies Line voltage is applied between the "

Page 4

All installations and services must be performed by qualified service personnel. Compressor contactor The control provides switched 24VAC to operate a

Page 5

All installations and services must be performed by qualified service personnel. Anti-Short Cycle Operation To prevent compressor short cycling, a cal

Page 6

All installations and services must be performed by qualified service personnel. Speed Selection values Three dip switches select 8 cooling speeds.

Page 7

All installations and services must be performed by qualified service personnel. OH5 2-STAGE OH5 2-STAGE

Page 8

All installations and services must be performed by qualified service personnel. B. GENERAL GUIDELINES TO TROUBLESHOOTING GE ECM – DRIVEN SYSTEMS :

Page 9

All installations and services must be performed by qualified service personnel.  Check for air whistling thru seams in ducts, cabinets or panels  C

Page 10

All installations and services must be performed by qualified service personnel. Figure 3: ECM PIN CONNECTORS Troubleshooting table above and F

Page 11

All installations and services must be performed by qualified service personnel. C. TROUBLESHOOTING CHARTS CONFIRM IF EITHER BLOWER WHEEL IS RUBBING

Page 12

All installations and services must be performed by qualified service personnel. INDEX SECTION BEGINNING PAGE I. FURNACE SPECIFICATIONS (SH

Page 13

All installations and services must be performed by qualified service personnel. BLOWER Off-Delay Active? Sequence of Operation BURNER On1. A/C Off 2

Page 14

All installations and services must be performed by qualified service personnel. Sequence of Operation Glossary Inputs: LIMIT - 120vac power from the

Page 15

All installations and services must be performed by qualified service personnel. I. FURNACE SPECIFICATIONS (SHIPPED SETTINGS) OL SERIES MODEL NO.

Page 16

All installations and services must be performed by qualified service personnel. OH SERIES MODEL NO. OH2 OH5-85 OH11-105 OH5-85DXE HEAT INPUT RA

Page 17

All installations and services must be performed by qualified service personnel. OC SERIES MODEL NO. OC2-56 OC5-85 HEAT INPUT RATE IN BTU/HR 70

Page 18

All installations and services must be performed by qualified service personnel. II. BLOWER CONTROLLER INFORMATION A. TERMINAL DEFINITIONS & FI

Page 19 - C. TROUBLESHOOTING CHARTS

All installations and services must be performed by qualified service personnel. B. WIRING & SWITCHES HIGHBOY/LOWBOY Figure 1: BLOWER WIRING

Page 20

All installations and services must be performed by qualified service personnel. : TURN OFF THE ELECTRICAL POWER to the furnace before attempting to d

Page 21

All installations and services must be performed by qualified service personnel. : TURN OFF THE ELECTRICAL POWER to the furnace before attempting to d

Comments to this Manuals

No comments